Plant sizing
How Big a Solar Plant Does Your Factory Need
For a factory, textile mill or warehouse, a rule of thumb is how plants end up the wrong size. The right capacity fits the load, the roof or land, the tariff and the goal.
3 kW rooftop array. The subsidy on the cover is the central scheme maximum and still depends on eligibility.Every solar enquiry starts with the same question: “How many kW do I need?” At home, a rule of thumb is often enough. For a factory, textile mill or warehouse, a rule of thumb is how plants end up with the wrong plant.
Too large, and part of your investment produces power you cannot use when you need it. Too small, and you keep paying the grid for units solar could have supplied. The right size is the one that fits your load, your roof or land, your tariff and your goal, and it can be worked out with a method, not a guess.
The short answer
There is no standard industrial plant size. The right capacity comes from four inputs:
| Input | The question it answers |
|---|---|
| Your consumption | How many units do you use each month, and how does that change through the year? |
| Your load profile | How much of that use falls in daylight hours, when solar actually generates? |
| Your space | How much usable, shade-free roof or land do you have? |
| Your goal | Are you cutting the bill, maximising savings, or hitting a sustainability target? |
Step 1: Start with 12 months of bills
One month of bills hides seasons. A textile mill's summer load differs from its monsoon load, and a packaging unit's output may follow order cycles. Collect at least 12 months of bills and look at monthly units, peak demand and power factor.
If you are not sure how to read the units and demand lines, our guide to kW, kWh and kVA explains them.
Step 2: Find the daytime share of your load
This is the step most quotes skip. Solar generates in daylight, so what matters is how much of your consumption happens then.
- A single-shift plant that runs mostly in the day can use a large share of what solar produces.
- A three-shift plant has a flatter profile, and solar covers a smaller slice of the total.
- A plant with a heavy night load may need to size for the daytime portion only, rather than total consumption.
Step 3: Check what your space allows
A plant's size is capped by what you can physically install.
- Rooftop: usable area after setbacks, shading from chimneys, tanks and neighbouring structures, roof strength and orientation. Sheet roofs and RCC roofs need different structures.
- Ground-mount: available land, terrain and the distance to your connection point.
Higher-output modules can let you reach a target capacity in less space, which matters when the roof is the limit. The roof area needed per kWp varies with module rating, roof type and layout, which is why a site survey comes first.
Step 4: Turn the target into capacity
Once you know how many daytime units you want solar to supply, the maths is simple.
Required capacity (kWp) = Annual units you want solar to supply ÷ Annual yield per kWp
Illustrative example: a plant uses 40,000 units a month in daytime hours and wants solar to cover half of that. That is 20,000 units a month, or 240,000 units a year. Divide 240,000 by the annual yield of your site per kWp to get the required capacity.
Yield depends on location, orientation, tilt, shading, module type, temperature and cleaning, which is why a site survey and a simulation beat any generic figure.
Step 5: Convert capacity into modules
Module count follows from capacity and module rating.
Number of modules = Plant capacity (W) ÷ Module rating (W), rounded up
Illustrative example: a 100 kWp plant using 600 W modules needs 100,000 ÷ 600 = 166.7, so 167 modules in practice. The final count is also shaped by how modules are strung to match the inverter, and by the layout your roof allows.
Step 6: Check the electrical side
Capacity is not only about panels.
- Inverter sizing: the AC rating of the inverters relative to the DC capacity of the panels.
- Connection and transformer: whether your existing electrical infrastructure can take the plant's output.
- Metering and approvals: the utility's requirements for your consumer category.
Connection and metering rules differ by consumer category and utility and are revised from time to time. We work from the rules in force at the time of your application.
Right-sizing is not always as big as possible
Different goals produce different sizes from the same plant:
- Lowest bill: size to your daytime load so nearly everything solar produces is used on site.
- Maximum savings from the roof: fill the usable roof, then check what happens to surplus generation under your connection rules.
- Sustainability target: size to the renewable share you want to report, which may point towards open access for the rest.
Does the commercial model change the size?
It can.
- CAPEX: you fund the plant, so size to the best return on your capital.
- RESCO / OPEX: you pay per unit consumed, so the plant is sized to what you will actually consume.
- Open access: when your roof cannot cover your needs, renewable energy from a project beyond your premises can fill the gap.
What this looks like in practice
Our rooftop plants range from 821 kWp at Artika Cotton Mills (Ramraj) in Erode, to 959 kWp at Chola Packaging and 1.3 MWp at Polyspin Exports Limited in Rajapalayam. For larger demand, we have built ground-mount plants such as the 7.8 MWp Koochur Solar Park in Krishnagiri and the 13 MWp Suvarrchit Renewable Energy plant in Tiruvannamalai. Each began with a study of the customer's load, not a catalogue size.
How Kyra sizes a plant
Our process starts with an Energy Study of your bills and load profile and a Site Survey of your roof or land. Engineering then models the layout and yield, followed by approvals, installation, commissioning, monitoring and maintenance, all with one team.
Since 2013, Kyra Photon has delivered end-to-end renewable energy solutions for commercial and industrial businesses, with 400+ projects commissioned across India.
Want a plant sized to your numbers?
Send us 12 months of bills and your site details, and our engineers will study your load and recommend a capacity that fits how your plant runs. Call 044-3531-1888 or visit kyraphoton.com.
FAQs
How many kW of solar does a factory need?
It depends on daytime consumption, available space, tariff and goals. Start from 12 months of bills and your load profile.
Should I size to my total consumption?
Usually not. Solar generates in daylight, so sizing to the daytime share of your load avoids paying for capacity you cannot fully use.
How many panels will my plant need?
Divide plant capacity in watts by the module rating and round up. The final count also depends on string design and roof layout.
What if my roof is too small?
Higher-output modules, ground-mount on spare land, or open access can bridge the gap.
Can I add capacity later?
Often yes, if the design allows for it from the start. Plan the electrical infrastructure with future expansion in mind.
This article is for general information only. Tariffs, tax treatment, regulations and technology specifications change over time and vary by project and consumer category, so please refer to current official sources and your advisors before making decisions. Project figures are as published by Kyra Photon.